Power Plant Demolition

Experience x Knowledge x Experience
We know power plant equipment

Kajitani Kogyo has been performing power plant demolition removal work for more than 20 years. We can image the blueprints so well that we can even determine the weight and size of turbines and boilers rather than the amount of electricity generated.

In order for power plant retirement to proceed smoothly and without problems, safety-backed construction methods and careful planning are necessary. Power plant facilities should not be viewed as objects.

We can handle everything from power plants for electric power companies throughout Japan to plants’ own power generation equipment, turbines, boilers, dust collectors, and chimneys. We can propose the most appropriate retirement solution that matches the characteristics of the power equipment.

Crane Demolition

Crane Demolition Expertise Cultivated Over 50 Years

We create our own construction plans, handle demolition with our own expertise, and manage the entire process as a one-stop solution.

We have a proven track record in demolishing everything with the name “crane,” and we promise that we can demolish in any environment and any shape. We can propose construction methods with a 100% success rate in various crane demolition projects.

Whether you have limited workspace, severe deterioration, a short demolition timeframe, or require emergency work, please leave it to us. We will suggest the most suitable demolition method tailored to the characteristics of the crane.

  • Overhead Crane

    Overhead Crane

  • Container Crane

    Container Crane

  • Jib Crane

    Jib Crane

  • Gantry Crane

    Gantry Crane

  • Unloader

    Unloader

  • Stacker Crane / Reclaimer

    Stacker Crane / Reclaimer

Chimney Demolition

We propose the most suitable demolition methods tailored to the characteristics of the chimney.

From small 10-meter bathhouse chimneys to towering chimneys exceeding 100 meters in height, we can demolish chimneys of any shape.

In locations without scaffolding, we have a track record of successfully installing custom-designed scaffolding and completing projects safely.

For chimneys associated with incineration facilities, we leverage our knowledge accumulated in dioxin countermeasure work to contribute to environmental preservation activities.

  • Demolition of Free-standing Steel Chimneys

    Demolition of Free-standing Steel Chimneys

  • Demolition of Grouped Steel Chimneys (Special Stage Construction)

    Demolition of Grouped Steel Chimneys (Special Stage Construction)

  • Demolition of Reinforced Concrete (RC) Chimneys (Special Stage Construction)

    Demolition of Reinforced Concrete (RC) Chimneys (Special Stage Construction)

Incinerator Demolition

We propose the most appropriate demolition method based on the characteristics of the incinerator.

We ensure the safety of workers and take comprehensive safety measures for the surrounding environment. This includes the demolition of waste incineration facilities.

We conduct pre-sampling surveys to establish countermeasures based on the pollution status and site conditions.

Of course, we thoroughly implement measures to prevent exposure to dioxins by the site manager, and we conduct the work with full consideration for safety in the surrounding environment.

  • Incinerator dismantling technology
  • Incinerator dismantling technology
  • Incinerator dismantling technology

Plant Equipment Demolition

We propose the most appropriate demolition method based on the characteristics of the plant.

Drawing on years of experience, we have undertaken various plant equipment demolition projects associated with power plants, chemical plants, oil refineries, and factory facilities.

Backed by our track record and experience, we understand the specific features of each plant and offer the most effective and safe demolition methods. This can be of great help for expedited demolition work.

Concrete Structure Demolition

Demolition methods that address safety and environmental conservation challenges are required.

When it comes to demolishing tower-like concrete structures such as chimneys and high-rise buildings, ensuring safety and environmental conservation is a major challenge. Our skilled technicians are actively involved in the demolition process, maintaining a comprehensive approach that covers safety and environmental considerations.

Through teamwork centered around our technicians, we can undertake projects that other companies may find challenging. Additionally, we offer clients a range of demolition methods tailored to the location conditions, surrounding environment, and level of complexity, all aimed at achieving short project durations and cost savings.

  • Walso Cutting

    Walso Cutting

  • Wire Saw Cutting

    Wire Saw Cutting

  • Building Lowering Method Using Wire Saw Cutting

    Building Lowering Method Using Wire Saw Cutting

  • Shimabun Corporation Former Third Building Demolition Project

    Shimabun Corporation Former Third Building Demolition Project