YearMonthDistinctionTypeConstruction locationContents of construction work
20241portcraneKansai AreaJib crane removal work
2portcraneKanto AreaUnloader removal work
2portcraneChubu AreaUnloader removal work
2steel manufacturecraneKansai AreaOverhead crane removal work
2electric powerothersKanto AreaThe windmill’s pulling out the fortifications.
2heavy industrycraneChubu AreaJib crane removal work
20231manufacturingplantKansai AreaShirring equipment removal work
1electric powerplantKanto AreaRemoval of large substation facilities
1electric powerplantKanto AreaRemoval of boiler facilities
2portcraneKanto AreaRemoval of 2 RMG units
2steel manufactureplantKansai AreaRemoval of nitrogen tanks
3environmentdioxinKansai AreaDemolition of sewage incineration facility (DXN countermeasure work)
3otherschimneyKansai AreaRC chimney removal work
4steel manufacturecraneKansai AreaGantry crane removal work
5portcraneKanto AreaRemoval of 2 RMG units
7gasplantKansai AreaLPG piping removed from fortification
7portcraneHokuriku AreaGantry crane demolition
7steel manufacturecraneKansai AreaOverhead crane removal work
8steel manufactureplantKansai Area1CAL equipment removal work
8heavy industryplantKansai AreaRemoval of equipment in an in-house factory
9steel manufactureplantKansai AreaGas turbine removal work
9steel manufacturecraneKansai AreaReclaimer removal work
10otherscraneChubu AreaReclaimer removal work
10portcraneKanto AreaRemoval of 2 RMG units
11steel manufactureplantKansai AreaRemoval of dust collector
12steel manufactureplantKanto AreaRemoval of coke oven extruder
12gasplantKansai AreaExisting piping removed from fortifications
12heavy industryplantKansai AreaRemoval of boiler facilities
20221manufacturingcraneChubu AreaCeiling Crane Demolition Work
1steel manufacturecraneKansai AreaCeiling Crane Demolition Work
2environmentplantKanto AreaEquipment Subframe Removal Work
2steel manufactureplantKansai AreaHeating Cover Removal Work (Asbestos Countermeasure)
2othersplantKanto AreaLow Concentration PCB Transformer Removal Work
3manufacturingplantKansai AreaKiln Furnace Insulation Removal Work (Asbestos Countermeasure)
3steel manufacturecraneKansai AreaStacker Crane Removal Work
4electric powerplantChugoku AreaWind Power Facility Removal Work for 2 Units
4manufacturingcraneKansai AreaRMG Crane Removal Work
5steel manufactureplantKansai AreaSteam Turbine Removal Work
5environmentdioxinChubu AreaWaste Incineration Facility Removal Work for 3 Units (DXN Countermeasure)
5steel manufacturecivil engineeringKansai AreaYard Conversion and Renovation Work
6portcraneHokuriku AreaGantry Crane Removal Work
6othersothersKansai AreaMaintenance Workshop Removal and Parking Lot Conversion Work
7portcraneChugoku AreaJib Crane Removal Work
7manufacturingcraneKyushu AreaOn-Site Building and Crane Removal Work
7steel manufactureplantKansai AreaWater Treatment Equipment Removal Work
7steel manufacturecraneKansai AreaCeiling Crane Demolition Work
7environmentdioxinKansai AreaWaste Incineration Facility Removal Work (DXN Countermeasure)
8steel manufactureenvironmentKansai AreaExhaust Heat Recovery Duct Insulation Removal Work
8steel manufactureplantKansai AreaLarge Press Machine Removal Work
9portcraneKanto AreaRemoval of 2 RMGs
9heavy industrycraneKansai AreaCeiling Crane Removal Work
9portcraneKansai AreaRemoval Work for Unloader Replacement
11gasplantKansai AreaLPG Tank Removal Work
11environmentcivil engineeringKansai AreaGround Improvement Work
12heavy industrychimneyKansai AreaSteel Chimney Removal Work
12manufacturingothersKansai AreaStructure Removal Work for Reconstruction
20211electric powerchimneyKansai AreaH180.0m Steel Chimney Removal Work for 2 Units
2othersothersKansai AreaAsbestos-Containing Building Material Removal Work
2environmentchimneyKansai AreaChimney and Incineration Plant Removal Work (DXN Countermeasure)
3chemistryothersKansai AreaConcrete Test Specimen Removal Work
4environmentdioxinKansai AreaHarmless Treatment of Incinerators and Chimneys (DXN Countermeasure)
4environmentdioxinKanto AreaWaste Incineration Facility Removal Work (DXN Countermeasure)
5steel manufactureplantKansai AreaInclined Tower Removal Work
6electric powerplantKanto AreaLarge Substation Equipment Removal Work
7environmentdioxinKansai AreaRefractory Removal Work for Preheaters (DXN Countermeasure)
8heavy industrycraneKansai AreaCeiling Crane Demolition Work
8steel manufactureplantKansai AreaAuxiliary Equipment Removal Work for Blast Furnace
9steel manufactureplantKansai AreaBoiler Removal Work
9steel manufactureplantKansai AreaCogeneration Gas Facility Removal Work
10gasplantKansai AreaUnnecessary Gas Piping Removal Work (Asbestos Countermeasure)
10portcraneKanto AreaYacht Yard Crane Removal Work
11portcraneKanto AreaGantry Crane Removal Work
11steel manufacturechimneyKansai AreaSinter Plant Chimney Aviation Obstruction Light Installation Work
12chemistrychimneyKyushu AreaH180m Steel Chimney Removal Work
12steel manufactureplantKansai AreaWelding Manufacturing Line Removal Work
20201steel manufactureplantKansai AreaPainting Line Removal Work
2gasbuildingKansai AreaLarge Warehouse Removal Work
3electric powerplantKansai AreaBoiler and Turbine Power Plant Equipment Removal Work
3heavy industrycraneKansai AreaCeiling Crane Demolition Work
3gasplantKansai AreaMixing Drum Removal Work
3steel manufacturecraneKansai AreaCeiling Crane Demolition Work
3othersplantKansai AreaSteel Tower Removal Work
3steel manufactureplantKansai AreaBelt Conveyor Removal Work
4steel manufactureenvironmentKansai AreaRaw Material Processing Equipment Removal Work
5heavy industryplantKansai AreaShearing Equipment Removal Work
5steel manufactureplantKansai AreaDust Collector Removal Work
5environmentdioxinKanto AreaIncineration Plant Demolition Work (DXN Countermeasure)
5steel manufacturechimneyKansai AreaH80.0m Steel Chimney Removal Work
5steel manufactureplantKansai AreaPickling Tank Demolition Work
6portothersHokkaido AreaStacker Crane and Conveyor Removal Work
6steel manufactureplantKansai AreaBelt Conveyor Frame Support Demolition Work
6environmentdioxinKansai AreaHarmless Treatment of Incinerators and Chimneys (DXN Countermeasure)
6portcraneHokkaido AreaUnloader Removal Work
6chemistrychimneyKansai AreaH30.0m Steel Chimney Removal Work
6steel manufactureplantKansai AreaConveyor Removal Work
8chemistryothersKansai AreaHeat Exchanger Piping Insulation Removal Work
8chemistryplantKansai AreaEthanol Facility Demolition Work
9heavy industrycraneKansai AreaCeiling Crane Demolition Work
10electric powerothersKansai AreaResidue Removal Work
10Residue Removal WorkplantTouhoku AreaEquipment and Machinery Removal Work
10heavy industrycraneKansai AreaCeiling Crane Demolition Work
12otherscraneKanto AreaYacht Crane Removal Work
12steel manufactureplantKansai AreaHeating Furnace Removal Work
12heavy industryplantKansai AreaShearing Equipment Removal Work
12portcraneKanto AreaUnloader Demolition Work
20191othersplantKansai AreaConveyor Removal Work
1chemistryplantKansai AreaEquipment and Machinery Removal Work
2steel manufactureplantKanto AreaEP (Electrostatic Precipitator) Upgrading Work
2otherscraneChugoku AreaCeiling Crane Demolition Work
2otherschimneyKyushu AreaIncinerator Chimney Removal Work (DXN Countermeasure)
3steel manufactureplantKansai AreaConveyor Removal Work
3steel manufactureplantKansai AreaEast Wharf Equipment Removal Work
3portcraneKansai AreaRemoval of 1 Gantry Crane
3othersothersKansai AreaInterior Demolition Work
4steel manufactureplantKansai AreaConveyor Removal Work
5portcraneHokuriku AreaRemoval of 1 Gantry Crane
5gasplantKansai AreaGreenhouse Station Demolition and Removal Work
6portcraneKansai AreaRemoval of 2 Jib Cranes
6steel manufactureplantKansai AreaCGL (Continuous Galvanizing Line) Equipment Removal Work
6steel manufactureplantKansai AreaPlant Facility Removal Work
8othersplantKansai AreaPainting Booth Demolition Work
8portcraneChubu AreaRemoval of 1 Gantry Crane
9steel manufactureplantKansai AreaPainting Line Removal Work
10portcraneKanto AreaTransfer Crane Removal Work
10steel manufactureplantKansai AreaConveyor Frame Replacement Work
10steel manufactureplantKansai AreaGas Holder Demolition Work
11otherschimneyChugoku AreaRC (Reinforced Concrete) Chimney Removal Work
11environmentdioxinKansai AreaAir Preheater Removal Work (DXN Countermeasure)
11othersplantChubu AreaCold Furnace and Others Removal Work
11gasplantKansai AreaHot Water Facility Removal Work
12steel manufactureplantKansai AreaRecuperator Removal Work
12steel manufactureplantKansai AreaGas Holder Demolition Work
12portcraneKanto AreaRemoval of 3 Gantry Cranes
20181portcraneHokkaido AreaRemoval of 1 Gantry Crane
1portcraneKansai AreaRemoval of 1 Gantry Crane
2environmentplantKanto AreaConveyor Dismantling Work
2otherschimneyKyushu AreaIncinerator Chimney Removal Work (DXN Countermeasure)
2othersdioxinKyushu AreaIncinerator Chimney Removal Work (DXN Countermeasure)
3steel manufactureplantKansai AreaBlast Furnace Upper House Demolition and Removal Work
4othersplantKansai AreaPainting Booth Demolition Work
4electric powerplantKanto AreaBoiler and Turbine Removal Work
5electric powerplantChugoku AreaHeat Recovery Equipment Removal Work
6othersplantKansai AreaOutdoor and Indoor Equipment Removal Work
7shipbuildingcraneKansai AreaJib Crane Removal Work
7steel manufactureplantKansai AreaPickling Equipment Demolition Work
7othersplantKansai AreaPainting Booth Demolition Work
7steel manufactureplantKansai AreaRW Electric Furnace Building Demolition Work
8othersplantChugoku AreaForming Machine Demolition Work
8environmentbuildingKanto AreaBuilding Demolition Work
8otherschimneyKansai AreaIncinerator Chimney Removal Work (DXN Countermeasure)
8othersothersHokuriku AreaTank Repair Work
9steel manufactureplantKansai AreaDuct Removal Work
9steel manufactureplantKansai AreaConveyor Removal Work
9portcraneKansai AreaTransfer Crane Removal Work
10steel manufacturecraneKansai AreaUnloader Removal Work
10shipbuildingcraneKansai AreaJib Crane Removal Work
10othersbuildingKansai AreaBuilding Demolition Work
10heavy industrybuildingKansai AreaRC (Reinforced Concrete) Employee Dormitory Demolition Work
11portcraneKanto AreaHorizontal Reel Crane Demolition Work
11heavy industryplantKansai AreaPress Machine Demolition Work
11othersplantChugoku AreaEquipment and Machinery Removal Work
11steel manufacturechimneyKansai AreaBoiler Chimney Removal Work
12steel manufactureplantKansai AreaPreheating Equipment Removal Work
12othersplantKansai AreaPainting Booth Demolition Work
12othersplantChugoku AreaForming Machine Demolition Work
20171environmentdioxinChugoku AreaIncinerator Chimney Demolition Work (DXN Countermeasure)
1steel manufactureothersKansai AreaPerlite Extraction Work
2steel manufacturecraneKanto AreaHeat Reclaimer Demolition Work
2otherscraneChubu AreaJib Crane Removal Work
2chemistryplantKansai AreaRemoval Work for Raw Oil and Fat Tanks in Conjunction with Replacement
4environmentothersKanto AreaS-Structure Facility Demolition Work
4steel manufactureplantKansai AreaDemolition Work for Steel-Making Converters Maintenance Area Expansion
4steel manufactureothersKansai AreaS-Structure Building and Equipment Removal Work
4othersothersKansai AreaFactory Building Demolition Work
4gasothersKansai AreaDissipation Tower Removal Work
4otherscraneKansai AreaRemoval of 1 Gantry Crane
5environmentdioxinKansai AreaIncinerator Facility Demolition Work (DXN Countermeasure)
5steel manufactureplantKansai AreaMid-Size Line Demolition Work
5steel manufactureplantKansai AreaCantilever Removal Work
5steel manufactureplantKansai AreaRemoval Work for Mill in Conjunction with Renewal
6otherscraneKanto AreaRemoval of 4 Gantry Cranes
6steel manufactureplantKansai AreaCGL Line Demolition Work
6steel manufactureplantKansai Area2SPL Line Demolition Work
7steel manufactureplantKansai AreaCoke Blending Hopper Removal Work
8chemistryplantHokuriku AreaEquipment and Machinery Removal Work
9chemistryplantHokuriku AreaS-Structure Building Removal Work
9otherscraneTouhoku AreaAssistance Work for the Replacement of Large Cranes
11steel manufactureplantKansai AreaOutdoor Dust Collection Equipment Demolition Work
12chemistryplantHokuriku AreaEquipment and Machinery Removal Work
20161steel manufactureplantKansai AreaShearing Equipment Removal Work
1steel manufactureenvironmentKansai AreaOil Removal and Decontamination Work for 1REV Equipment Disposal
1steel manufactureplantKansai AreaDemolition Work for Equipment Adjacent to the Homogenizing Furnace in the Steel Plate Factory
1steel manufactureplantKansai AreaScrap-Down Work for 4 Sinter EP Renewal
1steel manufactureplantKansai AreaConveyor Scrap-Down Work
2heavy industryplantKansai AreaEquipment Base Removal Work
2chemistryplantKansai AreaRPO Equipment Removal Work
2otherschimneyKyushu AreaSteel Chimney Demolition Work
2logisticscraneKansai AreaRemoval of 2 Gantry Cranes
2steel manufactureplantKansai Area6Co Furnace CDQ Equipment Removal Work
2othersplantChugoku AreaAssistance Work for Reheat Furnace Installation
2gasplantKansai AreaBoiler Equipment Removal Work
2steel manufactureplantKansai AreaScrap-Down Work in Conjunction with Overhead Crane Demolition
3environmentdioxinKanto AreaEssential Refurbishment Work for Incinerator Facilities – Phase 3 (DXN Countermeasure))
3steel manufactureplantKansai AreaRemoval of Thick Plate Equipment No. 2 Transfer
4steel manufactureothersKansai AreaBuilding Demolition Work
4electric powerplantChubu AreaRemoval of 4 Turbines
5othersothersKansai AreaBase Removal Work
5otherscraneKansai AreaRemoval of Existing Gantry Crane
5steel manufactureplantKansai AreaDemolition Work in Conjunction with Yard SS Conveyor Renewal
5heavy industryplantKansai Area3rd-Phase Removal Work in Conjunction with Water Treatment Plant Renewal
5steel manufactureplantKansai AreaCutting Assistance Work for Major Repairs
6shipbuildingcraneKansai AreaRemoval of Jib Crane
7steel manufactureplantKansai AreaPower Thin Plate Booster Removal Work
7othersplantShikoku AreaCarburizing Furnace Demolition and Removal Work
7environmentdioxinTouhoku AreaEssential Refurbishment Work for Incinerator Facilities – Phase 2 (DXN Countermeasure)
7steel manufactureplantKansai AreaBridge Crossing Demolition Work
7steel manufactureplantKansai AreaRemoval of Container Recycling Facility Equipment
9steel manufactureplantKansai AreaRemoval of Power LPG Facility Equipment
10steel manufactureplantKansai AreaHoist Crane Removal Work
10othersplantKansai AreaThrough-Flow Boiler Removal Work
10scienceplantKansai AreaFL-4 Bus Furnace Demolition Work
11steel manufacturecraneKansai AreaLadle Crane Demolition Work
11otherscraneChubu AreaRemoval of 1 Gantry Crane
20152steel manufactureplantKansai AreaThin Plate Factory Sleeve Station Work
2steel manufactureplantKansai AreaDemolition Work for 1 Generator MIX in the Power Plant
2otherschimneyKanto AreaDemolition of RC Chimney Refractory Materials
2heavy industryothersKansai AreaTemporary Storage Item Demolition Work
4othersbuildingKansai AreaDemolition of S-Structured Buildings
4heavy industryplantKansai AreaWater Treatment Equipment Demolition and Removal Work
4environmentdioxinKanto AreaEssential Refurbishment Work for Incinerator Facilities – Phase 2 (DXN Countermeasure)
4chemistryothersKansai AreaDemolition of 3 Refrigeration Machines
4othersenvironmentKansai AreaTransformer Relocation Work
4othersothersKansai AreaEV Shaft Demolition Work
4steel manufactureplantKansai AreaDemolition of Thick Plate Equipment
4chemistryplantHokuriku AreaMolten and Recovery Process Demolition Work
4othersothersKansai AreaMechanical Parking Garage Demolition Work
5steel manufacturechimneyKansai AreaDemolition of Steel Chimney in the Heating Furnace
6environmentdioxinKanto AreaDemolition of Waste Incineration Facility (DXN Countermeasure)
6chemistryplantChugoku AreaBoiler Demolition Work in Conjunction with the Removal of 1 Generator
6steel manufactureplantKansai AreaRecuperator Demolition Work
7othersdioxinKansai AreaDemolition of Incinerator Facilities (DXN Countermeasure)
7otherschimneyKansai AreaRC Chimney Demolition Work
7environmentdioxinKanto AreaDemolition of 2 Incinerators (DXN Countermeasure)
8heavy industryplantKansai AreaPress Machine Demolition Work
8environmentdioxinKanto AreaDemolition of Sludge Incinerator (DXN Countermeasure)
8heavy industryplantKanto AreaAcid Pickling Equipment Demolition Work
8environmentdioxinToukai AreaEssential Refurbishment Work for Incinerator Facilities – Phase 2 (DXN Countermeasure)
8heavy industryplantKansai AreaWater Treatment Equipment Demolition and Removal Work – Phase 2
8environmentplantKansai AreaDemolition Work in Conjunction with Facility Upgrades
9steel manufactureplantKansai AreaDemolition of Unnecessary Piping in the Sinter Plant
9steel manufacturecraneKansai AreaCrane Demolition Work
9chemistryplantKansai AreaRemoval of Unnecessary Tanks
9environmentdioxinKansai AreaDemolition of Incinerator Mechanical Equipment (DXN Countermeasure)
10environmentplantKanto AreaDemolition of Waste Oil Recovery Equipment
10steel manufactureplantKansai AreaDemolition of Unnecessary Equipment in the Sinter Plant
10environmentdioxinKansai AreaEssential Refurbishment Work for Incinerator Facilities – Phase 1 (DXN Countermeasure)
10steel manufactureplantKansai AreaDemolition Work for 4 SP4 Secondary SC and Others
10steel manufactureplantKansai AreaRemoval of Unnecessary Piping Around 5-1 SP Main Exhaust EP
10steel manufactureplantKansai AreaRemoval of Raw Material Testing Equipment in the Sintered Raw Material Plant
11otherscraneKansai AreaDemolition and Foundation Work for Jib Cranes and Gantry Cranes
11environmentplantKansai AreaDemolition of Existing Equipment
11otherschimneyKanto AreaDemolition of the Sewage Management Building Chimney
11steel manufactureplantKansai AreaDemolition of H-beam Line Equipment
12othersdioxinKansai AreaDemolition of Small Incinerators (DXN Countermeasure)
12steel manufactureplantKansai AreaBoiler Hood Scrap-Down Work
20141gasplantKansai AreaWork involving thermal cutting associated with equipment removal
1environmentdioxinTouhoku AreaDemolition of 2 Rotary Kilns (DXN Countermeasure)
1heavy industrybuildingKansai AreaInternal demolition work of equipment
1environmentdioxinKanto AreaDemolition of steel chimney (DXN Countermeasure)
1chemistrychimneyKansai AreaDemolition of boilers and RC chimneys
2environmentasbestosKansai AreaAsbestos removal work
2othersothersKansai AreaBillboard demolition work
2gasplantKansai AreaPlant equipment demolition work
2glassplantKansai AreaRemoval work of kiln surroundings
3heavy industrybuildingKansai AreaDemolition work within S-structured buildings
3othersplantKansai AreaPlant equipment demolition work
3environmentdioxinKanto AreaPlant equipment demolition work (DXN Countermeasure)
3environmentothersKansai AreaPCB reduction facility decontamination work
3othersothersKansai AreaBreakwater removal work
3gasbuildingKansai AreaWarehouse building demolition work
4heavy industrychimneyChubu AreaDemolition of steel chimney
4othersdioxinKansai AreaDemolition of small incinerators (DXN Countermeasure)
4chemistryplantChugoku AreaDemolition of raw material silos and others
4gasbuildingKansai AreaDemolition of eaves of buildings
4steel manufactureplantKansai AreaRemoval of boiling and heating equipment
4othersasbestosKansai AreaAsbestos removal work
4steel manufactureplantKansai AreaDemolition of continuous casting equipment
5chemistryplantKansai AreaPress machine demolition work
5steel manufactureplantKansai AreaCellar demolition work
5steel manufacturecraneKansai AreaOverhead crane demolition work
5environmentdioxinKansai AreaDemolition of kiln and forming machine (DXN Countermeasure)
5electric powerplantChubu AreaDemolition of boilers and power generator equipment
6steel manufactureplantKansai AreaAcid pickling equipment demolition work
6environmentdioxinKanto AreaEssential refurbishment work for incinerator facilities (DXN Countermeasure)
7chemistrychimneyKansai AreaRC chimney demolition work
7othersothersKansai AreaToll booth removal work associated with becoming toll-free
8othersbuildingKansai AreaDemolition of S-structured buildings
8chemistrychimneyKansai AreaRC chimney demolition work
9steel manufacturecraneKansai AreaOverhead crane demolition work
9environmentdioxinKansai AreaRemoval of refractory materials inside RC chimneys (DXN Countermeasure)
9environmentdioxinChubu AreaEssential refurbishment work for incinerator facilities (DXN Countermeasure)
9othersplantKansai AreaSake brewery tank demolition work
10heavy industrycraneKansai AreaShuttle crane demolition work
10heavy industryplantKansai AreaRemoval of ancillary equipment
10heavy industrybuildingKansai AreaBuilding demolition work
10steel manufactureplantKansai AreaCoal tar extraction operation
10chemistrychimneyKansai AreaDemolition of RC chimneys
10othersplantKanto AreaAssistance in steel billet bar rolling
10steel manufactureplantKansai AreaCutting of thick plate slabs
11steel manufactureplantKansai AreaDemolition of bogie type ladle B furnaces
11steel manufactureplantKansai AreaRemoval of PCI ducts
11steel manufactureplantKansai AreaOverhead crane demolition work
12steel manufactureplantKansai AreaRemoval of heavy oil pipes and insulation materials
12steel manufactureplantKansai AreaRemoval of 1 REV in the thin plate factory
12othersothersChubu AreaDemolition of playground equipment
12othersplantKanto AreaPress machine demolition work
20131otherscraneKansai AreaDemolition of 2 Container Cranes
2chemistrychimneyKansai AreaDemolition of RC Chimneys
2chemistryplantKansai AreaLaboratory Equipment Demolition
2gasothersKansai AreaRemoval of Recyclable Materials
2othersplantKanto AreaDemolition of Forging Press Machines
2environmentdioxinChubu AreaStoker Furnace Cleaning Work (DXN Countermeasure)
3gasplantKansai AreaTesting Equipment Demolition
3othersplantKyushu AreaMST Facility Phase 1 Work
3environmentdioxinKansai AreaDemolition of 2 Stoker Furnaces (DXN Countermeasure)
3glassplantKansai AreaDemolition of 2 Dust Collectors
3othersplantKansai AreaPlant Equipment Demolition
5heavy industryplantKanto AreaSolar Techno Park Demolition
6othersplantKansai AreaDemolition of Raw Material Silos
6othersplantKyushu AreaMST Facility Phase 2 Work
8othersplantKanto AreaDemolition of Forging Press Machines
9heavy industrybuildingKansai AreaDemolition of RC Structures
9otherscraneKansai AreaOverhead Crane Demolition
9othersothersKansai AreaDemolition of Equipment for Crane Assembly
9environmentothersKansai AreaClosure of Incinerator Chimneys
9othersothersKansai AreaRemoval of Advertising Signs
9chemistryplantChugoku AreaDemolition and Disposal of Tile Manufacturing Equipment
10othersplantKanto AreaRemoval and Disposal of Large Transformers and Overhead Crane Demolition
10othersdioxinKansai AreaIncinerator Facility Demolition (DXN Countermeasure)
10environmentasbestosKansai AreaAsbestos Removal
11otherschimneyKansai AreaDemolition of RC Chimneys
12othersasbestosKansai AreaAsbestos Removal
12othersdioxinKansai AreaDemolition of RC Chimneys (DXN Countermeasure)
H242heavy industrycraneKansai AreaDemolition of Jib Cranes
3chemistryplantKansai AreaPlant Equipment Demolition
4otherschimneyKansai AreaDemolition of 40m RC Chimneys
5steel manufacturecraneKansai AreaOverhead Crane Demolition
6environmentdioxinKansai AreaDemolition of Old Incinerators
6othersothersKansai AreaDismantling of Elevator-Type Parking Garages
8othersdioxinKansai AreaGasification Furnace Demolition (DXN Countermeasure)
8steel manufactureplantTouhoku AreaDismantling of Steel Plant Equipment
9othersdioxinKanto AreaIncinerator Facility Demolition (DXN Countermeasure)
9glassplantKansai AreaDismantling of Platemaking Equipment
10chemistryplantKansai AreaFacility Demolition
10othersplantKansai AreaRelocation and Removal of Riveting Equipment
12heavy industrybuildingKansai AreaBuilding Demolition and Removal Work
12glassplantKansai AreaRemoval of Kiln Surrounding Equipment
20111othersbuildingKansai AreaDemolition of Large Parking Structure
2gasbuildingKansai AreaGreenhouse Building Demolition
2othersbuildingKansai AreaDemolition of Large Parking Structure
4steel manufacturecraneKansai AreaOverhead Crane Demolition
5steel manufactureplantKansai AreaAcid Tank Demolition
6chemistryasbestosKansai AreaAsbestos Pipe Removal
8environmentchimneyKansai AreaWaste Incineration Facility Chimney Demolition
9otherscraneKanto AreaDemolition of Jib Cranes
10steel manufactureplantKansai AreaDesulfurization Tower Demolition
11steel manufacturecraneKansai AreaOverhead Crane Demolition
12othersplantKansai AreaHume Pipe Plant Demolition
12chemistryplantKansai AreaEslec P Plant Demolition
20101gasothersKansai AreaMultilevel Parking Structure Demolition
2steel manufactureplantKansai AreaAir Compressor Demolition
2steel manufactureplantKansai AreaTurbine Demolition
3heavy industrycraneKanto AreaDemolition of a 30-ton Earthmoving Crane
5othersdioxinKanto AreaSelf-Dissolving Furnace DXN Countermeasure Work
5environmentplantKansai AreaGas Tank Demolition
5steel manufacturecraneKansai AreaOverhead Crane Demolition
7steel manufactureplantChugoku AreaBoiler Demolition
8environmentdioxinKansai AreaWastewater Treatment Plant Dioxin Countermeasure Work
8steel manufacturedioxinKansai AreaWaste Incinerator Demolition
9othersplantKansai AreaRaw Material Silo Demolition
9othersbuildingKansai AreaBuilding Demolition
10steel manufactureplantKanto AreaBlast Furnace Demolition
10electric powerplantKansai AreaBoiler Demolition
11othersothersKansai AreaMultilevel Parking Structure Demolition
11othersbuildingKansai AreaDemolition Work Due to Office Relocation
12chemistryplantShikoku AreaBoiler Demolition
12steel manufacturebuildingKansai AreaDemolition Work Due to Office Relocation
12heavy industryplantKansai AreaFurnace Demolition
H211othersothersKansai AreaMultilevel Parking Structure Demolition of 3 Buildings
1othersbuildingKansai AreaAbove-Ground Annex Removal and Other Work
1steel manufactureplantKansai AreaDesalination Equipment Demolition
1steel manufacturecraneKansai AreaOverhead Crane Demolition
2steel manufactureplantKansai AreaAccumulator Equipment Demolition
3heavy industrycraneKansai AreaJib Crane Demolition
3steel manufacturecraneKansai AreaDemolition of Jib Cranes, Truck Scales, and Dust Conveyors
5othersbuildingKansai AreaDemolition of Old Residential Buildings Due to New Housing Construction
5othersothersKansai AreaMultilevel Parking Structure Demolition
5chemistrycraneKansai AreaDemolition of 2 Overhead Hoist Cranes
6heavy industryplantKansai AreaHitachi Metal Equipment Demolition
7steel manufactureplantKansai Area6000-Ton Press Machine Demolition
8othersbuildingKansai AreaCooperative Bank Demolition
9othersbuildingKansai AreaSeiki Shorihinsha Demolition
9chemistryplantKansai AreaDemolition Work for Air Conditioning Equipment Upgrades – Phase 2
9othersbuildingKansai AreaDemolition Work for New Construction
10steel manufactureplantKansai AreaConverter Demolition
11othersplantKansai AreaHead Office Factory Equipment Demolition
12steel manufactureplantKansai AreaBundling Machine Demolition
12otherscraneKanto AreaRemoval of 74 Overhead Cranes
12othersothersKansai AreaDemolition of Parking Lots, Transformer Yards, and Floor Paving
20081othersbuildingKansai AreaRemoval Work Due to Relocation
2gasplantKansai AreaDemolition of Climate-Controlled Room
3gasplantKansai AreaDismantling of Bulk Density Equipment in Powder Warehouse
3gasplantKansai AreaDismantling of Powder Equipment in MCMB Warehouse
4environmentdioxinKansai AreaIndustrial Waste Incinerator Demolition (DXN Countermeasure)
5othersothersKansai AreaFloating Dock and Sightseeing Boat Demolition
5othersdioxinKansai AreaIndustrial Waste Incinerator Demolition (DXN Countermeasure)
6gasplantKansai AreaDismantling of Cherry G Equipment and Container House
6chemistryplantKansai AreaHigh-Voltage Receiving Equipment Demolition and Removal
6steel manufactureplantKansai AreaConveyor Line Demolition
7othersdioxinKansai AreaIndustrial Waste Incinerator Demolition (DXN Countermeasure)
8othersbuildingKansai AreaDemolition of Building in First Storage Warehouse
8heavy industrycraneKansai AreaDemolition of SX-1 Dock Crane
8othersothersKansai AreaMultilevel Parking Structure Demolition
9environmentdioxinKansai AreaDemolition Work Due to Renovation (DXN Countermeasure)
9othersbuildingKansai AreaDemolition Work for Renovation of East Factory and Bridge Factory
10othersbuildingKansai AreaCommercial Store Demolition for New Construction
11glasschimneyKansai AreaDemolition of Reinforced Concrete Self-Supporting Chimney (Height: 120m)
12othersothersKansai AreaDemolition Work for Seismic Retrofitting
20071electric powerplantToukai AreaPower Generation Facility Demolition
1glassplantKansai AreaDemolition of N-8 Tank
2othersasbestosKansai AreaAsbestos Abatement Work
3othersbuildingKansai AreaDemolition of Kakogawa Company Housing Buildings 1 and 4
4electric powerplantKansai AreaConstruction Waste and Exhaust Gas Treatment Equipment Demolition
4electric powerplantKansai AreaConstruction Waste and Exhaust Gas Treatment Equipment Demolition
4heavy industryothersKansai AreaConcrete Cutting Work
5otherscraneKansai AreaDock Crane Demolition
7steel manufactureplantKanto AreaPlant Equipment Removal
7steel manufactureplantKansai AreaDemolition of No. 1 Casting Equipment
8othersothersKansai AreaElevated Water Tank Demolition
9otherscraneKansai AreaDemolition of 2 Cranes
9steel manufactureplantChugoku AreaHeating Furnace Demolition
9chemistrydioxinKansai AreaDioxin Countermeasure Work for ST Facilities
10steel manufacturebuildingChugoku AreaNitric Acid Equipment Building Demolition
10gasplantKansai AreaMCMB Equipment Removal
12glassplantKansai AreaSludge Tank Demolition
12gasplantKansai AreaD30t 2D Tower Crane Demolition
20061heavy industrycraneKansai AreaPhase Two Maintenance Work
2heavy industrybuildingKansai AreaPhase Two Maintenance Work
3steel manufactureplantKansai AreaGutter Factory Demolition
3othersbuildingKansai AreaOffice Demolition
5steel manufactureplantKansai AreaBlast Furnace Site Clearing Work
6steel manufactureplantKansai AreaBuilding Demolition
7steel manufacturecraneKansai AreaCeiling Crane Demolition
7othersbuildingKansai AreaWarehouse Building Demolition
7gasplant Water Reservoir Demolition
7otherschimneyChubu AreaRRC Chimney, Boiler, and Other Demolition
7steel manufactureplantChugoku AreaLarge-scale Furnace Demolition
8petroleumplantKansai AreaOsaka Oil Refinery Tank Demolition
10othersbuildingKansai AreaCafeteria Demolition in the Warehouse
10othersbuildingKansai AreaKobe City Kita Ward Company Housing Demolition
10gasbuildingKansai AreaBuilding Demolition in Yushima Higashiku North Area
10steel manufactureplantKansai AreaCrematory Ash Storage Tank Demolition
11steel manufactureplantKansai AreaCrematory Ash Storage Tank Demolition Phase Two
12gasplantKansai AreaRemoval of LNG Satellite Facilities
12othersothersKansai AreaElevated Water Tank Demolition
20051steel manufactureplantKansai AreaBlast Furnace Stove Demolition
2steel manufactureplantKansai AreaPellet Handling Work
3steel manufactureplantKansai AreaBlast Furnace Demolition
3othersplant Plant Facility Demolition
4electric powerplantKansai AreaBoiler, Turbine, and Building Demolition
4othersplant Demolition of a 3,000L Tank
5heavy industryplantKansai AreaPlant Facility Demolition
6othersbuildingKansai AreaAutomated Warehouse Demolition for Logistics Pipes
6environmentdioxinKansai AreaCleaning Plant Dioxin Countermeasure Work
8steel manufactureplantChubu AreaDemolition of Casting Machines and Others
12steel manufactureplantKansai AreaTurbine and Associated Facility Demolition
12steel manufactureplantKansai AreaOxygen Plant Demolition
20041others  Factory Demolition Work
1othersplantKansai AreaSmelting Equipment Demolition
1gasplantKansai AreaCooling Tower Demolition
3steel manufactureplantKansai AreaPlant Facility Demolition
5steel manufactureplantKanto AreaConverter Demolition
6gasplantKansai AreaDemolition of 2 Spherical Tanks
6gasplantKansai AreaTank-Related Equipment Demolition
7steel manufactureplantKansai AreaFurnace Body Demolition
7glassplantKansai AreaGas Holder Demolition
8steel manufactureplantKansai AreaBlower Plant Demolition
8steel manufactureplantKansai AreaBlast Furnace Body Demolition
10electric powerchimneyKansai AreaDemolition of a 150m Steel Stack
11steel manufactureplantKansai AreaRaw Material Conveyor Demolition
11otherschimneyShikoku AreaDemolition of a 100m Steel Stack and Tanks
12steel manufactureplantKanto AreaRolling Mill Equipment Demolition
20031petroleumplantToukai AreaPlant Facility Demolition
2electric powerplantKansai AreaBoiler, Turbine, and Building Demolition
3heavy industrycraneKanto AreaDock Crane Demolition
4steel manufactureplantKanto Area4,000-Ton Plating Line Demolition
4othersbuilding Building Demolition
4steel manufactureplantKansai Area3,000-Ton Plant Facility Demolition
4steel manufactureplantKanto Area2,700-Ton Mantle Demolition
5glassplantKansai AreaElectric Furnace Demolition
7othersbuilding Total Demolition of 7,450 m2 of Site Area
7electric powerplantKanto AreaPlant Facility Demolition
8othersbuildingKansai AreaBuilding Demolition
9othersbuildingKansai AreaFactory Demolition
9gasplantKansai AreaAdsorption Test Demolition
11electric powerplantKansai AreaTank and Other Plant Facility Demolition
11environmentdioxinKansai AreaDioxin Countermeasure Work at Wastewater Treatment Plant
11steel manufactureplantKansai AreaTopide Car Demolition
12glassplantToukai AreaPlant Facility Demolition
12electric powerplantKansai AreaTank Demolition